SMBA Thesaurus / Organizations / International Institute of Business Analysis (IIBA)

International Institute of Business Analysis (IIBA)

Terms Referencing This Resource (219)

acceptance criteria

Criteria associated with requirements, products, or the delivery cycle that must be met in order to achieve stakeholder acceptance.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

actor

A human, device, or system that plays some specified role in interacting with a solution.

IIBA BABOK Guide V3

adaptive approach

An approach where the solution evolves based on a cycle of learning and discovery, with feedback loops which encourage making decisions as late as possible.

IIBA BABOK Guide V3

allocation

IIBA BABOK Guide V3

artifact

Any solution-relevant object that is created as part of business analysis efforts.

IIBA BABOK Guide V3

assumption

An influencing factor that is believed to be true but has not been confirmed to be accurate, or that could be true now but may not be in the future.

IIBA BABOK Guide V3

behavioural business rule

BABOK: A business rule that places an obligation (or prohibition) on conduct, action, practice, or procedure; a business rule whose purpose is to shape (govern) day-to-day business activity. Also known as operative rule.

IIBA BABOK Guide V3SBVR Specification

behavioural characteristics

Your demonstrated character traits on the job that are observed by others or by you.

IIBA BABOK Guide V3Business Analysis Competency Model V4

benchmarking

A comparison of a decision, process, service, or system's cost, time, quality, or other metrics to those of leading peers to identify opportunities for improvement.

IIBA BABOK Guide V3

body of knowledge

The aggregated knowledge and generally accepted practices on a topic.

IIBA BABOK Guide V3

brainstorming

A team activity that seeks to produce a broad or diverse set of options through the rapid and uncritical generation of ideas.

IIBA BABOK Guide V3

business (business analysis)

See enterprise

IIBA BABOK Guide V3

business analysis

The practice of enabling change in the context of an enterprise by defining needs and recommending solutions that deliver value to stakeholders.

IIBA BABOK Guide V3Business Analysis Competency Model V4

business analysis approach

The set of processes, rules, guidelines, heuristics, and activities that are used to perform business analysis in a specific context.

IIBA BABOK Guide V3

business analysis communication plan

A description of the types of communication the business analyst will perform during business analysis, the recipients of those communications, and the form and frequency of those communications.

IIBA BABOK Guide V3

business analysis effort

The scope of activities a business analyst is engaged in during the life cycle of an initiative.

IIBA BABOK Guide V3Business Analysis Competency Model V4

business analysis information

Any kind of information at any level of detail that is used as an input to business analysis work, or as an output of business analysis work.

IIBA BABOK Guide V3Business Analysis Competency Model V4

business analysis package

A document, presentation, or other collection of text, matrices, diagrams and models, representing business analysis information.

IIBA BABOK Guide V3

business analysis plan

A description of the planned activities the business analyst will execute in order to perform the business analysis work involved in a specific initiative.

IIBA BABOK Guide V3

business analyst

Any person who performs business analysis, no matter their job title or organizational role.

IIBA BABOK Guide V3Business Analysis Competency Model V4

business case

A justification for a course of action based on the benefits to be realized by using the proposed solution, as compared to the cost, effort, and other considerations to acquire and live with that solution.

IIBA BABOK Guide V3

business decision

A decision that can be made based on strategy, executive judgment, consensus, and business rules, and that is generally made in response to events or at defined points in a business process.

IIBA BABOK Guide V3

business domain

See domain.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

business (business world)

An economic system where any commercial, industrial, or professional activity is performed for profit.

IIBA BABOK Guide V3

business goal

A state or condition that an organization is seeking to establish and maintain, usually expressed qualitatively rather than quantitatively.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

business need

A problem or opportunity of strategic or tactical importance to be addressed.

IIBA BABOK Guide V3

business objective

An objective, measurable result to indicate that a business goal has been achieved.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

business policy

A non-practicable directive that controls and influences the actions of an enterprise.

IIBA BABOK Guide V3

business problem

An issue of strategic or tactical importance preventing an enterprise or organization from achieving its goals.

IIBA BABOK Guide V3

business process

An end-to-end set of activities which collectively responds to an event, and transforms information, materials, and other resources into outputs that deliver value directly to the customers of the process. It may be internal to an organization, or it may span several organizations.

IIBA BABOK Guide V3Business Analysis Competency Model V4

business process management

A management discipline that determines how manual and automated processes are created, modified, cancelled, and governed.

IIBA BABOK Guide V3

business process re-engineering

Rethinking and redesigning business processes to generate improvements in performance measures.

IIBA BABOK Guide V3

business requirement

A representation of goals, objectives and outcomes that describe why a change has been initiated and how success will be assessed.

IIBA BABOK Guide V3

business rule

SBVR: rule that is practicable and that is under business jurisdiction

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

capability

The set of activities the enterprise performs, the knowledge it has, the products and services it provides, the functions it supports, and the methods it uses to make decisions.

IIBA BABOK Guide V3

cause-and-effect diagram

See fishbone diagram.

IIBA BABOK Guide V3

change

The act of transformation in response to a need.

IIBA BABOK Guide V3

change agent

One who is a catalyst for change.

IIBA BABOK Guide V3

change control

Controlling changes to requirements and designs so that the impact of requested changes is understood and agreed-to before the changes are made.

IIBA BABOK Guide V3Business Analysis Competency Model V4

change management

Planned activities, tools, and techniques to address the human side of change during a change initiative, primarily addressing the needs of the people who will be most affected by the change.

IIBA BABOK Guide V3

change strategy

A plan to move from the current state to the future state to achieve the desired business objectives.

IIBA BABOK Guide V3

change team

A cross-functional group of individuals who are mandated to implement a change. This group may be comprised of product owners, business analysts, developers, project managers, implementation subject matter experts (SMEs), or any other individual with the relevant set of skills and competencies required to implement the change.

IIBA BABOK Guide V3

checklist (business analysis)

A standard set of quality elements that reviewers use for requirements verification.

IIBA BABOK Guide V3Business Analysis Competency Model V4

collaboration

The act of two or more people working together towards a common goal.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

commercial off-the-shelf

A prepackaged solution available in the marketplace which address all or most of the common needs of a large group of buyers of those solutions. A commercial off-the-shelf solution may require some configuration to meet the specific needs of the enterprise.

IIBA BABOK Guide V3

competitive analysis

A structured assessment which captures the key characteristics of an industry to predict the long-term profitability prospects and to determine the practices of the most significant competitors.

IIBA BABOK Guide V3

component

A uniquely identifiable element of a larger whole that fulfills a clear function.

IIBA BABOK Guide V3

concept model

An analysis model that develops the meaning of core concepts for a problem domain, defines their collective structure, and specifies the appropriate vocabulary needed to communicate about it consistently.

IIBA BABOK Guide V3

constraint (business analysis)

An influencing factor that cannot be changed, and that places a limit or restriction on a possible solution or solution option.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

context

The circumstances that influence, are influenced by, and provide understanding of the change.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

core_concept_(business_analysis)

One of six ideas that are fundamental to the practice of business analysis: Change, Need, Solution, Context, Stakeholder, and Value.

IIBA BABOK Guide V3

cost-benefit analysis

An analysis which compares and quantifies the financial and non-financial costs of making a change or implementing a solution compared to the benefits gained.

IIBA BABOK Guide V3

create, read, update, and delete matrix

A two-dimensional matrix showing which user roles have permission to access specific information entities, and to create new records in those entities, view the data in existing records, update or modify the data in existing records, or delete existing records. The same type of matrix can be used to show which processes, instead of users, have the create, read, update and delete rights.

IIBA BABOK Guide V3

customer

A stakeholder who uses or may use products or services produced by the enterprise and may have contractual or moral rights that the enterprise is obliged to meet.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

decision analysis

An approach to decision making that examines and models the possible consequences of different decisions, and assists in making an optimal decision under conditions of uncertainty.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

decomposition

A technique that subdivides a problem into its component parts in order to facilitate analysis and understanding of those components.

IIBA BABOK Guide V3

definitional business rule

BABOK: A rule that indicates something is necessarily true (or untrue); a rule that is intended as a definitional criterion for concepts, knowledge, or information. Also known as a structural rule.

IIBA BABOK Guide V3SBVR Specification

deliverable

Any unique and verifiable work product or service that a party has agreed to deliver.

IIBA BABOK Guide V3

design

A usable representation of a solution. For more information see Key Terms and Requirements and Designs.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

document analysis (business analysis)

An examination of the documentation of an existing system in order to elicit requirements.

IIBA BABOK Guide V3

domain

The sphere of knowledge that defines a set of common requirements, terminology, and functionality for any program or initiative solving a problem.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

domain subject matter expert

A stakeholder with in-depth knowledge of a topic relevant to the business need or solution scope.

IIBA BABOK Guide V3

dynamic systems development method

A project delivery framework which focuses on fixing cost, quality, and time at the beginning while contingency is managed by varying the features to be delivered.

IIBA BABOK Guide V3

elicitation

Iterative derivation and extraction of information from stakeholders or other sources.

IIBA BABOK Guide V3

end user

A stakeholder who directly interacts with the solution.

IIBA BABOK Guide V3

enterprise

A system of one or more organizations and the solutions they use to pursue a shared set of common goals.

IIBA BABOK Guide V3

enterprise readiness assessment

An assessment that describes the enterprise is prepared to accept the change associated with a solution and is able to use it effectively.

IIBA BABOK Guide V3

entity-relationship diagram

A graphical representation of the entities relevant to a chosen problem domain and the relationships between them.

IIBA BABOK Guide V3

estimate

A quantitative assessment of a planned outcome, resource requirements, and schedule where uncertainties and unknowns are systematically factored into the assessment.

IIBA BABOK Guide V3

evaluation

The systematic and objective assessment of a solution to determine its status and efficacy in meeting objectives over time, and to identify ways to improve the solution to better meet objectives. See also indicator; metric, monitoring.

IIBA BABOK Guide V3

event (business analysis)

An occurrence or incident to which an organizational unit, system, or process must respond.

IIBA BABOK Guide V3

evolutionary prototype

A prototype that is continuously modified and updated in response to feedback from stakeholders.

IIBA BABOK Guide V3

experiment

Elicitation performed in a controlled manner to make a discovery, test a hypothesis, or demonstrate a known fact.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

external interface

An interaction that is outside the proposed solution. It can be another hardware system, software system, or a human interaction with which the proposed solution will interact.

IIBA BABOK Guide V3

facilitation

The art of leading and encouraging people through systematic efforts toward agreed-upon objectives in a manner that enhances involvement, collaboration, productivity, and synergy.

IIBA BABOK Guide V3

feasibility study

An evaluation of proposed alternatives to determine if they are technically, organizationally, and economically possible within the constraints of the enterprise, and whether they will deliver the desired benefits to the enterprise.

IIBA BABOK Guide V3

feature

A distinguishing characteristic of a solution that implements a cohesive set of requirements and which delivers value for a set of stakeholders.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

fishbone diagram

A diagramming technique used in root cause analysis to identify underlying causes of an observed problem, and the relationships that exist between those causes. Also known as an Ishikawa or cause-and-effect diagram.

IIBA BABOK Guide V3

focus group

A group formed to elicit ideas and attitudes about a specific product, service, or opportunity in an interactive group environment. The participants share their impressions, preferences, and needs, guided by a moderator.

IIBA BABOK Guide V3

force field analysis

A graphical method for depicting the forces that support and oppose a change. Involves identifying the forces, depicting them on opposite sides of a line (supporting and opposing forces) and then estimating the strength of each set of forces.

IIBA BABOK Guide V3

functional requirement

A capability that a solution must have in terms of the behaviour and information the solution will manage.

IIBA BABOK Guide V3

gap analysis

A comparison of the current state and desired future state of an enterprise in order to identify differences that need to be addressed.

IIBA BABOK Guide V3

goal

See business goal.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

governance process (change)

A process by which appropriate decision makers use relevant information to make decisions regarding a change or solution, including the means for obtaining approvals and priorities.

IIBA BABOK Guide V3

guideline (business analysis)

An instruction or description on why or how to undertake a task.

IIBA BABOK Guide V3

horizontal prototype

A prototype that is used to explore requirements and designs at one level of a proposed solution, such as the customer-facing view or the interface to another organization.

IIBA BABOK Guide V3

impact analysis

An assessment of the effects a proposed change will have on a stakeholder or stakeholder group, project, or system.

IIBA BABOK Guide V3Business Analysis Competency Model V4

implementation subject matter expert

A stakeholder who has specialized knowledge regarding the implementation of one or more solution components.

IIBA BABOK Guide V3

indicator

A specific numerical measurement that indicates progress toward achieving an impact, output, activity, or input. See also metric.

IIBA BABOK Guide V3

initiative

A specific project, program, or action taken to solve some business problem(s) or achieve some specific change objective(s).

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

input (business analysis)

Information consumed or transformed to produce an output. An input is the information necessary for a task to begin.

IIBA BABOK Guide V3Business Analysis Competency Model V4

inspection

A formal review of a work product by qualified individuals that follows a predefined process, and uses predefined criteria, for defect identification and removal.

IIBA BABOK Guide V3

interface

A shared boundary between any two persons and/or systems through which information is communicated.

IIBA BABOK Guide V3

interoperability

Ability of systems to communicate by exchanging data or services.

IIBA BABOK Guide V3

interview

Eliciting information from a person or group of people in an informal or formal setting by asking relevant questions and recording the responses.

IIBA BABOK Guide V3

Ishikawa diagram

See fishbone diagram.

IIBA BABOK Guide V3

iteration (business analysis)

A single instance of progressive cycles of analysis, development, testing, or execution.

IIBA BABOK Guide V3

knowledge area (business analysis)

An area of expertise that includes several specific business analysis tasks.

IIBA BABOK Guide V3

lessons learned process

A process improvement technique used to learn about and improve on a process or project. A lessons learned session involves a special meeting in which the team explores what worked, what didn't work, what could be learned from the just-completed iteration, and how to adapt processes and techniques before continuing or starting anew.

IIBA BABOK Guide V3

life_cycle

A series of changes an item or object undergoes from inception to retirement.

IIBA BABOK Guide V3Business Analysis Competency Model V4

matrix

A textual form of modelling used to represent information that can be categorized, cross-referenced, and represented in a table format.

IIBA BABOK Guide V3

metadata

A description of data to help understand how to use that data, either in terms of the structure and specification of the data, or the description of a specific instance of an object.

IIBA BABOK Guide V3

methodology

A body of methods, techniques, procedures, working concepts, and rules used to solve a problem.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

metric

A quantifiable level of an indicator measured at a specified point in time.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

mission statement

A formal declaration of values and goals that expresses the core purpose of the enterprise.

IIBA BABOK Guide V3

model

A representation and simplification of reality developed to convey information to a specific audience to support analysis, communication, and understanding.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

monitoring

Collecting data on a continuous basis from a solution in order to determine how well a solution is implemented compared to expected results. See also metric; indicator.

IIBA BABOK Guide V3

need

A problem or opportunity to be addressed.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

non-functional requirement

A type of requirement that describes the performance or quality attributes a solution must meet. Non-functional requirements are usually measurable and act as constraints on the design of a solution as a whole.

IIBA BABOK Guide V3

objective

See business objective.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

observation (business analysis)

Studying and analyzing one or more stakeholders in their work environment in order to elicit requirements.

IIBA BABOK Guide V3

online analytical processing

A business intelligence approach that allows users to analyze large amounts of data from different points of view.

IIBA BABOK Guide V3

operational support

A stakeholder who is responsible for the day-to-day management and maintenance of a system or product.

IIBA BABOK Guide V3

operative business rule

See behavioural business rule.

IIBA BABOK Guide V3

organization

An autonomous group of people under the management of a single individual or board, that works towards common goals and objectives.

IIBA BABOK Guide V3

organizational capability

A function inside the enterprise, made up of components such as processes, technologies, and information and used by organizations to achieve their goals.

IIBA BABOK Guide V3

organizational unit

Any recognized association of people within an organization or enterprise.

IIBA BABOK Guide V3

organization modelling

The analysis technique used to describe roles, responsibilities and reporting structures that exist within an enterprise.

IIBA BABOK Guide V3

peer_review

A formal or informal review of a work product to identify errors or opportunities for improvement. See also inspection.

IIBA BABOK Guide V3

plan

A detailed scheme for doing or achieving something usually comprising a set of events, dependencies, expected sequence, schedule, results or outcomes, materials and resources needed, and how stakeholders need to be involved.

IIBA BABOK Guide V3

predictive approach

An approach where planning and baselines are established early in the life cycle of the initiative in order to maximize control and minimize risk.

IIBA BABOK Guide V3

prioritization

Determining the relative importance of a set of items in order to determine the order in which they will be addressed.

IIBA BABOK Guide V3

process

A set of activities designed to accomplish a specific objective by taking one or more defined inputs and turning them into defined outputs.

IIBA BABOK Guide V3

process model

A set of diagrams and supporting information about a process and factors that could influence the process. Some process models are used to simulate the performance of the process.

IIBA BABOK Guide V3

product (business analysis)

A solution or component of a solution that is the result of an initiative.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

product backlog

A set of user stories, requirements, or features that have been identified as candidates for potential implementation, prioritized, and estimated.

IIBA BABOK Guide V3

product vision statement

A brief statement or paragraph that describes the goals of the solution and how it supports the strategy of the organization or enterprise.

IIBA BABOK Guide V3

project

A temporary endeavour undertaken to create a unique product, service, or result.

IIBA BABOK Guide V3

project manager

A stakeholder who is responsible for managing the work required to deliver a solution that meets a business need, and for ensuring that the project's objectives are met while balancing the project constraints, including scope, budget, schedule, resources, quality, and risk.

IIBA BABOK Guide V3

project scope

The work that must be performed to deliver a product, service, or result with the specified features and functions.

IIBA BABOK Guide V3

proof_of_concept

A model created to validate the design of a solution without modelling the appearance, materials used in the creation of work, or processes and workflows ultimately used by the stakeholders.

IIBA BABOK Guide V3

prototype

A partial or simulated approximation of the solution for the purpose of eliciting or verifying requirements with stakeholders.

IIBA BABOK Guide V3

quality

The degree to which a set of inherent characteristics fulfills needs.

IIBA BABOK Guide V3

quality assurance

set of activities performed to ensure that a process will deliver products that meet an appropriate level of quality.

IIBA BABOK Guide V3

quality attributes

A set of measures used to judge the overall quality of a system. See also non-functional requirements.

IIBA BABOK Guide V3

questionnaire

A set of defined questions, with a choice of answers, used to collect information from respondents.

IIBA BABOK Guide V3

regulator

A stakeholder from outside the organization who is responsible for the definition and enforcement of standards.

IIBA BABOK Guide V3

repository

A real or virtual facility where all information on a specific topic is stored and is available for retrieval.

IIBA BABOK Guide V3

request for information

A formal elicitation method intended to collect information regarding a vendor's capabilities or any other information relevant to a potential upcoming procurement.

IIBA BABOK Guide V3

request for proposal

A requirements document issued when an organization is seeking a formal proposal from vendors. An RFP typically requires that the proposals be submitted following a specific process and using sealed bids which will be evaluated against a formal evaluation methodology.

IIBA BABOK Guide V3

request for quote

A procurement method of soliciting price and solution options from vendors.

IIBA BABOK Guide V3

request for tender

An open invitation to vendors to submit a proposal for goods or services.

IIBA BABOK Guide V3

requirement

A usable representation of a need.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

requirements allocation

The process of assigning requirements to be implemented by specific solution components.

IIBA BABOK Guide V3

requirements artifact

A business analysis artifact containing information about requirements such as a diagram, matrix, document or model.

IIBA BABOK Guide V3

requirements attribute

A characteristic or property of a requirement used to assist with requirements management.

IIBA BABOK Guide V3

requirements defect

A problem or error in a requirement. Defects may occur because a requirement is poor quality (see requirements verification) or because it does not describe a need that, if met, would provide value to stakeholders (see requirements validation).

IIBA BABOK Guide V3

requirements life cycle

The stages through which a requirement progresses from inception to retirement.

IIBA BABOK Guide V3

requirements management

Planning, executing, monitoring, and controlling any or all of the work associated with requirements elicitation and collaboration, requirements analysis and design, and requirements life cycle management.

IIBA BABOK Guide V3Business Analysis Competency Model V4

requirements management plan

A subset of the business analysis plan for a specific change initiative, describing specific tools, activities, and roles and responsibilities that will be used on the initiative to manage the requirements.

IIBA BABOK Guide V3

requirements management tool

Special-purpose software that provides support for any combination of the following capabilities: elicitation and collaboration, requirements modelling and/or specification, requirements traceability, versioning and baselining, attribute definition for tracking and monitoring, document generation, and requirements change control.

IIBA BABOK Guide V3

requirements model

An abstract (usually graphical) representation of some aspect of the current or future state.

IIBA BABOK Guide V3

requirements package

A specialized form of a business analysis package primarily concerned with requirements. A requirements package may represent a baseline of a collection of requirements.

IIBA BABOK Guide V3

requirements traceability

The ability for tracking the relationships between sets of requirements and designs from the original stakeholder need to the actual implemented solution. Traceability supports change control by ensuring that the source of a requirement or design can be identified and other related requirements and designs potentially affected by a change are known.

IIBA BABOK Guide V3Business Analysis Competency Model V4

requirements validation

Work done to evaluate requirements to ensure they support the delivery of the expected benefits and are within the solution scope.

IIBA BABOK Guide V3

requirements verification

Work done to evaluate requirements to ensure they are defined correctly and are at an acceptable level of quality. It ensures the requirements are sufficiently defined and structured so that the solution development team can use them in the design, development, and implementation of the solution.

IIBA BABOK Guide V3

requirements workshop

A structured meeting in which a carefully selected group of stakeholders collaborate to define and/or refine requirements under the guidance of a skilled neutral facilitator.

IIBA BABOK Guide V3Business Analysis Competency Model V4

residual risk

The risk remaining after action has been taken or plans have been put in place to deal with the original risk.

IIBA BABOK Guide V3

return on investment (business analysis)

A measure of the profitability of a project or investment.

IIBA BABOK Guide V3

risk (business analysis)

The effect of uncertainty on the value of a change, a solution, or the enterprise. See also residual risk.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

risk assessment

Identifying, analyzing and evaluating risks.

IIBA BABOK Guide V3

root cause

The cause of a problem having no deeper cause, usually one of several possible causes.

IIBA BABOK Guide V3

root cause analysis

A structured examination of an identified problem to understand the underlying causes.

IIBA BABOK Guide V3

scope

The boundaries of control, change, a solution, or a need.

IIBA BABOK Guide V3

scope model

A model that defines the boundaries of a business domain or solution.

IIBA BABOK Guide V3

secondary actor

An actor external to the system under design that supports the execution of a use case.

IIBA BABOK Guide V3

sequence diagram

A type of diagram that shows objects participating in interactions and the messages exchanged between them.

IIBA BABOK Guide V3

service (business analysis)

The performance of any duties or work for a stakeholder, from the perspective of the stakeholder.

IIBA BABOK Guide V3Business Analysis Competency Model V4

software engineer

See developer.

IIBA BABOK Guide V3

solution

A specific way of satisfying one or more needs in a context.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

solution component

A sub-part of a solution that can be people, infrastructure, hardware, software, equipment, facilities, and process assets or any combination of these sub-parts.

IIBA BABOK Guide V3

solution life cycle

The stages through which a solution progresses from inception to retirement.

IIBA BABOK Guide V3

solution option

One possible way to satisfy one or more needs in a context.

IIBA BABOK Guide V3

solution requirement

A capability or quality of a solution that meets the stakeholder requirements. Solution requirements can be divided into two sub-categories: functional requirements and non-functional requirements or quality of service requirements.

IIBA BABOK Guide V3

solution scope

The set of capabilities a solution must deliver in order to meet the business need.

IIBA BABOK Guide V3

sponsor

A stakeholder who is responsible for initiating the effort to define a business need and develop a solution that meets that need. They authorize the work to be performed and control the budget and scope for the initiative.

IIBA BABOK Guide V3

stakeholder

A group or individual with a relationship to the change, the need, or the solution.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

stakeholder analysis

Identifying and analyzing the stakeholders who may be impacted by the change and assess their impact, participation, and needs throughout the business analysis activities.

IIBA BABOK Guide V3

stakeholder list

A catalogue of the stakeholders affected by a change, business need, or proposed solution, and a description of their attributes and characteristics related to their involvement in the initiative.

IIBA BABOK Guide V3

stakeholder proxy (business analyst)

The role a business analyst takes when representing the needs of a stakeholder or stakeholder group.

IIBA BABOK Guide V3

stakeholder_requirement

A description of the needs of a particular stakeholder or class of stakeholders that must be met in order to achieve the business requirements. They may serve as a bridge between business requirements and the various categories of solution requirements.

IIBA BABOK Guide V3

stated requirement

A requirement articulated by a stakeholder that has not been analyzed, verified, or validated. Stated requirements frequently reflect the desires of a stakeholder rather than the actual need.

IIBA BABOK Guide V3

statement of work

A written description of the services or tasks that are required to be performed.

IIBA BABOK Guide V3

state diagram

An analysis model showing the life cycle of a data entity or class.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

strategy

A description of the chosen approach to apply the capabilities of an enterprise in order to reach a desired set of goals or objectives.

IIBA BABOK Guide V3

structural rule

See definitional business rule.

IIBA BABOK Guide V3

subject matter expert

See domain subject matter expert; implementation subject matter expert.

IIBA BABOK Guide V3

supplier

A stakeholder outside the boundary of a given organization or organizational unit who provides products or services to the organization and may have contractual or moral rights and obligations that must be considered.

IIBA BABOK Guide V3

survey

Collecting and measuring the opinions or experiences of a group of people through a series of questions.

IIBA BABOK Guide V3

swimlane

A horizontal or vertical section of a process diagram that shows which activities are performed by a particular actor or role.

IIBA BABOK Guide V3

system

A set of interdependent components that interact in various ways to produce a set of desired outcomes.

IIBA BABOK Guide V3

task (business analysis)

A discrete piece of work that may be performed formally or informally as part of business analysis.

IIBA BABOK Guide V3

technique

A manner, method, or style for conducting a business analysis task or for shaping its output.

IIBA BABOK Guide V3

temporal_event

An event based on time that can trigger the initiation of a process, evaluation of business rules, or some other response.

IIBA BABOK Guide V3

tester

An individual responsible for determining how to verify that the solution meets the requirements defined by the business analyst, and conducting the verification process.

IIBA BABOK Guide V3

throw-away prototype

A prototype used to quickly uncover and clarify requirements or designs using simple tools, sometimes just paper and pencil. It is intended to be discarded when the final system has been developed.

IIBA BABOK Guide V3

time-box

An agreed-upon period of time in which an activity is conducted or a defined deliverable is intended to be produced.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

transition requirement

A requirement that describes the capabilities the solution must have and the conditions the solution must meet to facilitate transition from the current state to the future state, but which are not needed once the change is complete. They are differentiated from other requirements types because they are of a temporary nature.

IIBA BABOK Guide V3

unified modelling language™

A notation specified by the Object Management Group for describing software application structure, behaviour, and architecture. It can also be used for describing business processes and data structures. The most common UML® diagrams used by business analysts are use case diagrams, activity diagrams, state machine diagrams (also known as state diagrams), and class diagrams.

IIBA BABOK Guide V3UML Specification

user acceptance test

Assessing whether the delivered solution meets the needs of the stakeholder group that will be using the solution. The assessment is validated against identified acceptance criteria.

IIBA BABOK Guide V3

user story

A small, concise statement of functionality or quality needed to deliver value to a specific stakeholder.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

use case

A description of the observable interaction between an actor (or actors) and a solution that occurs when the actor uses the system to accomplish a specific goal.

IIBA BABOK Guide V3

use case diagram

A type of diagram defined by UML® that captures all actors and use cases involved with a system or product.

IIBA BABOK Guide V3

validated requirement

A requirement that has been reviewed and is determined to support the delivery of the expected benefits, and is within the solution scope.

IIBA BABOK Guide V3

validation (business analysis)

The process of checking that a deliverable is suitable for its intended use. See also requirements validation.

IIBA BABOK Guide V3Business Analysis Competency Model V4

value (business analysis)

The worth, importance, or usefulness of something to a stakeholder in a context.

Agile Extension To The BABOK GuideIIBA BABOK Guide V3

value stream mapping

A complete, fact-based, time-series representation of the stream of activities required to deliver a product or service.

IIBA BABOK Guide V3

verification (business analysis)

The process of determining that a deliverable or artifact meets an acceptable standard of quality. See also requirements verification.

IIBA BABOK Guide V3

verified requirement

A requirement that has been reviewed and is determined to be defined correctly, adheres to standards or guidelines, and is at an acceptable level of detail.

IIBA BABOK Guide V3

vertical prototype

A prototype that is used to drill down into a proposed solution to uncover requirement and design considerations through multiple layers of a solution that are not easily understood or that are not discernible on the surface. It may include interaction between several solution components.

IIBA BABOK Guide V3

viewpoint

A set of conventions that define how requirements will be represented, how these representations will be organized, and how they will be related.

IIBA BABOK Guide V3

walkthrough

A review in which participants step through an artifact or set of artifacts with the intention of validating the requirements or designs, and to identify requirements or design errors, inconsistencies, omissions, inaccuracies, or conflicts.

IIBA BABOK Guide V3

workshop

A facilitated and focused event attended by key stakeholders for the purpose of achieving a defined goal.

IIBA BABOK Guide V3

work breakdown structure

A deliverable-oriented hierarchical decomposition of the work to be executed to accomplish objectives and create the required deliverables. It organizes and defines the total scope of the project.

IIBA BABOK Guide V3

work product (business analysis)

A document or collection of notes or diagrams used by the business analyst during the requirements development process.

IIBA BABOK Guide V3

business architecture

The design, structure, and behavior of the current and future states of an enterprise to provide a common understanding of the organization. It is used to align the enterprise’s strategic objectives and tactical demands.

IIBA BABOK Guide V3

enterprise_architecture

A description of the business processes, information technology, people, operations, information, and projects of an enterprise and the relationships between them.

IIBA BABOK Guide V3

requirements_architecture

The requirements of an initiative and the interrelationships between these requirements.

IIBA BABOK Guide V3

architecture

The design, structure, and behaviour of the current and future states of a structure in terms of its components, and the interaction between those components. See also business architecture, enterprise architecture, and requirements architecture.

IIBA BABOK Guide V3